Protection & local response
Devices retain protection duties. Local coordination checks capacity, reserves and critical loads before authorized adjustments.
DCP treats safety and business requirements as constraints before evaluating cost, energy use and resource life. Not every load is flexible, and not every migration produces a benefit.
AI concept · Not a project photograph or product specificationDevice protection, local control and scheduling have different roles. Measure actual response times; animation is not a performance test.
Devices retain protection duties. Local coordination checks capacity, reserves and critical loads before authorized adjustments.
Update plans using queues, generation, power trends and business priorities. Limit unnecessary switching and recovery rebounds.
Forecast demand, renewables, tariffs and tasks to plan operation, then correct deviations using observed conditions.
Adjustable capacity depends on operating conditions, not just nameplate ratings.
Check available and minimum power, ramp rate, duration and recovery time. Deduct protection margins and committed capacity.
Separate uninterrupted, degradable and deferrable tasks. Check runtime, data location, bandwidth and deadlines before migration.
Include energy, demand charges, migration, delays, battery wear and maintenance rather than comparing tariffs alone.
Flexible scheduling may release usable operating headroom; it does not increase transformer or feeder ratings.
Defer charging or batch tasks within authorized limits. Protection, critical services and essential comfort requirements take priority.
Assess storage duration, the service impact of power limits and whether migration is actually feasible.
Compare target and measured power. Record limit violations, task completion and recovery, restoring loads in stages to avoid rebounds.
Simulations explain mechanisms. Project outcomes require actual metering and a consistent baseline.
Evaluate demand management, local renewable use, demand response and emergency continuity separately. Do not add overlapping benefits.
Record the period, weather, workload, missing data and metering boundary. Separate policy effects from equipment and external changes.
Examine deviations, service levels, device states and incidents. Update resource assessments while retaining manual intervention and rollback.
Illustrative model, not live data, a DCP benchmark or a return promise. Compare power, grid energy and electricity cost at equal daily work.
Compute energy (unchanged)
480 kWh
Scheduled grid energy
1,788 kWh
Energy-charge difference
81.6 CNY
Grid peak (before → after)
125 → 114 kW
Swipe the chart or use the hour slider above to inspect values.
12:00 · Original 115 kW · Scheduled 103 kW · Solar 100 kW
Swipe the chart or use the hour slider above to inspect values.
12:00 · Original 15 kW · Scheduled 3 kW
Same tariffs and daily energy; grid energy charges only.
Solar consumed + grid imports = site demand. Surplus solar earns no revenue in this model.
Synthetic day, 1-hour steps. Fixed load: 95 kW at 08–17, 105 kW at 18–21, otherwise 70 kW. Original compute: 20 kW × 24 h. Movable work is ready at 00:00 and due by 24:00. Site limit: 160 kW. Assign 1 kWh increments by marginal grid cost. Illustrative tariffs: 0.4 at 00–06 and 23, 1.1 at 17–21, otherwise 0.7 CNY/kWh, not a regional tariff. Excludes migration overhead, demand charges, storage, depreciation, taxes, export revenue and emissions. Peak reduction is not the objective; grid peak may increase. Solar follows a synthetic sine curve.
| Hour | Original | Scheduled | Solar | Grid·before | Grid·after | Tariff |
|---|---|---|---|---|---|---|
| 0 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 1 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 2 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 3 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 4 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 5 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 6 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 7 | 90 | 78 | 26 | 64 | 52 | 0.7 |
| 8 | 115 | 103 | 50 | 65 | 53 | 0.7 |
| 9 | 115 | 103 | 71 | 44 | 32 | 0.7 |
| 10 | 115 | 103 | 87 | 28 | 16 | 0.7 |
| 11 | 115 | 103 | 97 | 18 | 6 | 0.7 |
| 12 | 115 | 103 | 100 | 15 | 3 | 0.7 |
| 13 | 115 | 103 | 97 | 18 | 6 | 0.7 |
| 14 | 115 | 103 | 87 | 28 | 16 | 0.7 |
| 15 | 115 | 103 | 71 | 44 | 32 | 0.7 |
| 16 | 115 | 103 | 50 | 65 | 53 | 0.7 |
| 17 | 115 | 103 | 26 | 89 | 77 | 1.1 |
| 18 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 19 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 20 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 21 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 22 | 90 | 78 | 0 | 90 | 78 | 0.7 |
| 23 | 90 | 114 | 0 | 90 | 114 | 0.4 |