From policy to operating results

DCP treats safety and business requirements as constraints before evaluating cost, energy use and resource life. Not every load is flexible, and not every migration produces a benefit.

From policy to operating results · AI concept · Not a project photograph or product specificationAI concept · Not a project photograph or product specification

01Coordinate across time horizons

Device protection, local control and scheduling have different roles. Measure actual response times; animation is not a performance test.

Protection & local response

Devices retain protection duties. Local coordination checks capacity, reserves and critical loads before authorized adjustments.

Rolling schedules

Update plans using queues, generation, power trends and business priorities. Limit unnecessary switching and recovery rebounds.

Day-ahead planning

Forecast demand, renewables, tariffs and tasks to plan operation, then correct deviations using observed conditions.

02Establish real flexibility

Adjustable capacity depends on operating conditions, not just nameplate ratings.

Power & dynamics

Check available and minimum power, ramp rate, duration and recovery time. Deduct protection margins and committed capacity.

Business & data

Separate uninterrupted, degradable and deferrable tasks. Check runtime, data location, bandwidth and deadlines before migration.

Full cost

Include energy, demand charges, migration, delays, battery wear and maintenance rather than comparing tariffs alone.

03Work within capacity limits

Flexible scheduling may release usable operating headroom; it does not increase transformer or feeder ratings.

Adjust noncritical loads first

Defer charging or batch tasks within authorized limits. Protection, critical services and essential comfort requirements take priority.

Coordinate storage & compute

Assess storage duration, the service impact of power limits and whether migration is actually feasible.

Verify and recover smoothly

Compare target and measured power. Record limit violations, task completion and recovery, restoring loads in stages to avoid rebounds.

04Use consistent measurement

Simulations explain mechanisms. Project outcomes require actual metering and a consistent baseline.

Scenarios

Evaluate demand management, local renewable use, demand response and emergency continuity separately. Do not add overlapping benefits.

Verification

Record the period, weather, workload, missing data and metering boundary. Separate policy effects from equipment and external changes.

Review

Examine deviations, service levels, device states and incidents. Update resource assessments while retaining manual intervention and rollback.

ENGINEERING / INTERACTIVE MODEL

24-hour compute-power model

Illustrative model, not live data, a DCP benchmark or a return promise. Compare power, grid energy and electricity cost at equal daily work.

Compute energy (unchanged)

480 kWh

Scheduled grid energy

1,788 kWh

Energy-charge difference

81.6 CNY

Grid peak (before → after)

125 → 114 kW

Site power and solar output / kW
OriginalScheduledSolar

Swipe the chart or use the hour slider above to inspect values.

05010015020000:0006:0012:0018:0023:00160 kW00:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW01:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW02:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW03:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW04:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW05:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW06:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW07:00 Original 90 kW / Scheduled 78 kW / Solar 26 kW08:00 Original 115 kW / Scheduled 103 kW / Solar 50 kW09:00 Original 115 kW / Scheduled 103 kW / Solar 71 kW10:00 Original 115 kW / Scheduled 103 kW / Solar 87 kW11:00 Original 115 kW / Scheduled 103 kW / Solar 97 kW12:00 Original 115 kW / Scheduled 103 kW / Solar 100 kW13:00 Original 115 kW / Scheduled 103 kW / Solar 97 kW14:00 Original 115 kW / Scheduled 103 kW / Solar 87 kW15:00 Original 115 kW / Scheduled 103 kW / Solar 71 kW16:00 Original 115 kW / Scheduled 103 kW / Solar 50 kW17:00 Original 115 kW / Scheduled 103 kW / Solar 26 kW18:00 Original 125 kW / Scheduled 113 kW / Solar 0 kW19:00 Original 125 kW / Scheduled 113 kW / Solar 0 kW20:00 Original 125 kW / Scheduled 113 kW / Solar 0 kW21:00 Original 125 kW / Scheduled 113 kW / Solar 0 kW22:00 Original 90 kW / Scheduled 78 kW / Solar 0 kW23:00 Original 90 kW / Scheduled 114 kW / Solar 0 kW

12:00 · Original 115 kW · Scheduled 103 kW · Solar 100 kW

Hourly grid import / kW
OriginalScheduled

Swipe the chart or use the hour slider above to inspect values.

05010015020000:0006:0012:0018:0023:0000:00 Original 90 kW / Scheduled 114 kW01:00 Original 90 kW / Scheduled 114 kW02:00 Original 90 kW / Scheduled 114 kW03:00 Original 90 kW / Scheduled 114 kW04:00 Original 90 kW / Scheduled 114 kW05:00 Original 90 kW / Scheduled 114 kW06:00 Original 90 kW / Scheduled 114 kW07:00 Original 64 kW / Scheduled 52 kW08:00 Original 65 kW / Scheduled 53 kW09:00 Original 44 kW / Scheduled 32 kW10:00 Original 28 kW / Scheduled 16 kW11:00 Original 18 kW / Scheduled 6 kW12:00 Original 15 kW / Scheduled 3 kW13:00 Original 18 kW / Scheduled 6 kW14:00 Original 28 kW / Scheduled 16 kW15:00 Original 44 kW / Scheduled 32 kW16:00 Original 65 kW / Scheduled 53 kW17:00 Original 89 kW / Scheduled 77 kW18:00 Original 125 kW / Scheduled 113 kW19:00 Original 125 kW / Scheduled 113 kW20:00 Original 125 kW / Scheduled 113 kW21:00 Original 125 kW / Scheduled 113 kW22:00 Original 90 kW / Scheduled 78 kW23:00 Original 90 kW / Scheduled 114 kW

12:00 · Original 15 kW · Scheduled 3 kW

Daily energy charge / CNY
Original1,271.2
Scheduled1,189.6
02,400 CNY

Same tariffs and daily energy; grid energy charges only.

Scheduled energy supply / kWh
Grid
1,788 kWh
On-site solar
762 kWh
Total site energy
2,550 kWh

Solar consumed + grid imports = site demand. Surplus solar earns no revenue in this model.

Assumptions, limitations and hourly data

Synthetic day, 1-hour steps. Fixed load: 95 kW at 08–17, 105 kW at 18–21, otherwise 70 kW. Original compute: 20 kW × 24 h. Movable work is ready at 00:00 and due by 24:00. Site limit: 160 kW. Assign 1 kWh increments by marginal grid cost. Illustrative tariffs: 0.4 at 00–06 and 23, 1.1 at 17–21, otherwise 0.7 CNY/kWh, not a regional tariff. Excludes migration overhead, demand charges, storage, depreciation, taxes, export revenue and emissions. Peak reduction is not the objective; grid peak may increase. Solar follows a synthetic sine curve.

Illustrative raw data · kW / CNY per kWh
HourOriginalScheduledSolarGrid·beforeGrid·afterTariff
0901140901140.4
1901140901140.4
2901140901140.4
3901140901140.4
4901140901140.4
5901140901140.4
6901140901140.4
790782664520.7
81151035065530.7
91151037144320.7
101151038728160.7
11115103971860.7
121151031001530.7
13115103971860.7
141151038728160.7
151151037144320.7
161151035065530.7
171151032689771.1
1812511301251131.1
1912511301251131.1
2012511301251131.1
2112511301251131.1
229078090780.7
23901140901140.4