Inventory meters, charging systems, solar, storage, EMS and industrial gateways. Define supported interfaces and permissions before connecting live equipment.
Energy assets. Local intelligence.
Connect distributed energy, site equipment and edge compute in one operating view. For campuses, buildings and businesses, edge agents support monitoring, authorized coordination and maintenance without bypassing existing equipment protection.
AI concept · Not a project photograph or product specification24-hour compute-power model
Illustrative model, not live data, a DCP benchmark or a return promise. Compare power, grid energy and electricity cost at equal daily work.
Compute energy (unchanged)
480 kWh
Scheduled grid energy
1,788 kWh
Energy-charge difference
81.6 CNY
Grid peak (before → after)
125 → 114 kW
Swipe the chart or use the hour slider above to inspect values.
12:00 · Original 115 kW · Scheduled 103 kW · Solar 100 kW
Swipe the chart or use the hour slider above to inspect values.
12:00 · Original 15 kW · Scheduled 3 kW
Same tariffs and daily energy; grid energy charges only.
- Grid
- 1,788 kWh
- On-site solar
- 762 kWh
- Total site energy
- 2,550 kWh
Solar consumed + grid imports = site demand. Surplus solar earns no revenue in this model.
Assumptions, limitations and hourly data
Synthetic day, 1-hour steps. Fixed load: 95 kW at 08–17, 105 kW at 18–21, otherwise 70 kW. Original compute: 20 kW × 24 h. Movable work is ready at 00:00 and due by 24:00. Site limit: 160 kW. Assign 1 kWh increments by marginal grid cost. Illustrative tariffs: 0.4 at 00–06 and 23, 1.1 at 17–21, otherwise 0.7 CNY/kWh, not a regional tariff. Excludes migration overhead, demand charges, storage, depreciation, taxes, export revenue and emissions. Peak reduction is not the objective; grid peak may increase. Solar follows a synthetic sine curve.
| Hour | Original | Scheduled | Solar | Grid·before | Grid·after | Tariff |
|---|---|---|---|---|---|---|
| 0 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 1 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 2 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 3 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 4 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 5 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 6 | 90 | 114 | 0 | 90 | 114 | 0.4 |
| 7 | 90 | 78 | 26 | 64 | 52 | 0.7 |
| 8 | 115 | 103 | 50 | 65 | 53 | 0.7 |
| 9 | 115 | 103 | 71 | 44 | 32 | 0.7 |
| 10 | 115 | 103 | 87 | 28 | 16 | 0.7 |
| 11 | 115 | 103 | 97 | 18 | 6 | 0.7 |
| 12 | 115 | 103 | 100 | 15 | 3 | 0.7 |
| 13 | 115 | 103 | 97 | 18 | 6 | 0.7 |
| 14 | 115 | 103 | 87 | 28 | 16 | 0.7 |
| 15 | 115 | 103 | 71 | 44 | 32 | 0.7 |
| 16 | 115 | 103 | 50 | 65 | 53 | 0.7 |
| 17 | 115 | 103 | 26 | 89 | 77 | 1.1 |
| 18 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 19 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 20 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 21 | 125 | 113 | 0 | 125 | 113 | 1.1 |
| 22 | 90 | 78 | 0 | 90 | 78 | 0.7 |
| 23 | 90 | 114 | 0 | 90 | 114 | 0.4 |
AI concept · Not a project photograph or product specificationConnect, observe and operate.
Edge agents support equipment and operators through standard gateways. Monitoring, inspection and coordination stay within the existing safety boundary.
Clear visibility
A shared view of device health, energy trends and alerts.
Local response
Handle eligible events near the site to reduce avoidable delay.
Evidence-led support
Inspection summaries and operating records support maintenance.
Bounded expansion
Connect energy and local compute where project conditions allow.
A clear path from inputs to evidence.
Process device health, demand trends and alerts close to the source. Keep sensitive data within the agreed boundary and give operators a consistent view of site conditions.
Validate proposed actions against customer authorization, interface rules and equipment limits. Inspection reports, gateway management and execution receipts form an auditable workflow.
Clear responsibilities. Coordinated operation.
Agree on equipment, interfaces, retention periods, approvals and operating metrics at project initiation. Performance is verified through site measurements and acceptance testing.